| Clause | Detail | |--------|--------| | | Up to 500 m free. Beyond that, add per 100 m. | | Lift | Up to 1.5 m free. Beyond that, add per 3.0 m. | | Water charges | 1% of estimated cost (or as specified). | | Royalty on minor minerals | To be paid extra (not included in DSR). | | GST / VAT | Not applicable – DSR 2015-16 includes excise/VAT as per pre-GST regime (use with caution today). | | Overheads | 15% for normal works, 20% for difficult terrain. |
This District Schedule of Rates for the year 2015–16 was approved by the Chief Engineer (Building & Communication), PWD Maharashtra, and is applicable from . Pwd Dsr 2015-16 Maharashtra
: Integrated costs for material testing (soil, concrete, bitumen) at government-approved laboratories. for a particular district or a detailed rate analysis for a certain item? Raigad DSR 2015-16 PWD PDF - Scribd | Clause | Detail | |--------|--------| | | Up to 500 m free