En 17168 [top] -A major focus of the standard is how these barriers interact with the wider rail network [3]: Synchronization Coverage extends to sub-surface, enclosed, and open-air stations. iTeh Standards Core Requirements en 17168 : Guidelines for testing the installation and ensuring the integrity of control systems through audible and visible alerts [3]. Implementation and Compliance A major focus of the standard is how : Strategies for electrical safety, such as bonding the system to station earth or insulating it from traction current. Implementation and Compliance en 17168 Manufacturers cannot self-declare compliance. A (third-party testing lab) must witness or perform the following tests: Just reply with the correct or expanded reference. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||
|
(Downloads for members only. Register or login.)